Description
S series Helical Geared Motor?Characteristics
one. Functions:
- Substantial efficiency: 75%-eighty%
- Substantial engineering: the?helical equipment and a worm gear merged with an integrated transmission to improve the torque and performance.
- High precision: the gear is produced of large-top quality alloy steel forging, carbonitriding and hardening treatment method, grinding method to ensure higher precision and steady working.
- Higher interchangeability: extremely modular, serial style, sturdy flexibility and interchangeability.
2. Specialized?parameters
?
Ratio | 6.8-288 |
Input power | .twelve-22KW |
Output torque | eleven-4530N.m |
Output velocity | 5-206rpm |
Mounting variety | Foot mounted, foot mounted with strong shaft, output flange mounted,?hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm.? |
Input Technique | Flange enter(AM), shaft input(Ad), inline AC motor input, or AQA servo motor |
Brake Launch | HF-guide launch(lock in the brake launch place), HR-guide launch(autom-atic braking place) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Type | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing content | HT200 high-toughness cast iron from R37,forty seven,57,67,77,87 |
Housing substance | HT250 Substantial energy solid iron from R97 107,137,147, 157,167,187 |
Warmth treatment?technology | carbonitriding and hardening treatment method |
One Phase Performance | 75%-80% |
Lubricant | VG220 |
Security Class | IP55, F?class |
About Us
ZheJiang Starshine Push Co.,Ltd,the predecessor was a state-owned navy mould enterprise, was recognized in 1965. Starshine specializes in the total electricity transmission resolution for high-finish products manufacturing industries primarily based on the goal of “Platform Item, Software Style and Professional Provider”.
Starshine have a powerful technological power with over 350 employees at current, including more than 30 engineering professionals, thirty high quality inspectors, masking an region of 80000 sq. meters and sorts of advanced processing machines and screening equipments. We have a excellent foundation for the sector application development and services of substantial-conclude speed reducers & variators proudly owning to the provincial engineering engineering study centre,the lab of gear speed reducers, and the base of modern R&D.
Our Group
Top quality Manage
Good quality:Insist?on?Improvement,Strive?for?Excellence?With?the?development?of?equipment?manufacturing?indurstry,JCPTer?never?satirsfy?with?the?current?quality?of?our?products,on?the?contrary,wcreate?the?value?of?quality.
Quality?policy:to?enhance?the?overall?level?in?the?field?of?power?transmission??
Quality?View:Continuous?Improvement?,?pursuit?of?excellence
Quality?Philosophy:Quality?creates?value
3.?Incoming?Quality?Control
To?establish?the?AQL?acceptable?level?of?incoming?material?control,?to?provide?the?material?for?the?whole?inspection,?sampling,?immunity.?On?the?acceptance?of?qualified?products?to?warehousing,?substandard?goods?to?take?return,?check,?rework,?rework?inspection?responsible?for?tracking?bad,?to?monitor?the?supplier?to?take?corrective?
measures?to?prevent?recurrence.
4.?Process?Quality?Control
The?manufacturing?site?of?the?first?examination,?inspection?and?final?inspection,?sampling?according?to?the?requirements?of?some?projects,?judging?the?quality?change?trend
?found?abnormal?phenomenon?of?manufacturing,?and?supervise?the?production?department?to?improve,?eliminate?the?abnormal?phenomenon?or?state.
5.?FQC(Final?QC)
After?the?manufacturing?department?will?complete?the?product,?stand?in?the?JCPTer’s?position?on?the?finished?product?quality?verification,?in?order?to?ensure?the?quality?of?
JCPTer?expectations?and?needs.
6.?OQC(Outgoing?QC)
After?the?product?sample?inspection?to?determine?the?qualified,?allowing?storage,?but?when?the?finished?product?from?the?warehouse?before?the?formal?delivery?of?the?goods,?there?is?a?check,?this?is?called?the?shipment?inspection.Check?content:In?the?warehouse?storage?and?transfer?status?to?confirm,?while?confirming?the?delivery?of?the?
merchandise is?a?product?inspection?to?determine?the?qualified?products.
7. Certification.
Packing
Shipping and delivery